Railroad Forums 

  • Search

  • Search it up!

Search found 874 matches

 Return to the advanced search

Re: Delays & Service Disruptions Tracker

 by MNCRR9000 ¦  Sun Oct 22, 2023 9:19 am ¦  Forum: MTA Metro-North Railroad and CtRail Passenger Rail (SLE, Hartford, Extensions) ¦  Topic: Delays & Service Disruptions Tracker ¦  Replies: 141 ¦  Views: 76300

Most likely not, condition of ROW terrible, disconnected rails,overgrowth, rail section removed at CT NY line. Some places you wouldn’t know there is a railroad. Also what would you use Harlem or New Haven Line, time consuming don’t think it’s worth it especially for Amtrak. I know Amtrak obviously...

Re: Delays & Service Disruptions Tracker

 by MNCRR9000 ¦  Sat Oct 21, 2023 3:29 pm ¦  Forum: MTA Metro-North Railroad and CtRail Passenger Rail (SLE, Hartford, Extensions) ¦  Topic: Delays & Service Disruptions Tracker ¦  Replies: 141 ¦  Views: 76300

Everyone: (10/21) A mudslide has blocked the Hudson Line between Tarrytown and Croton-Harmon... MNCR is terminating Hudson Line trains at Tarrytown and Croton-Harmon from the south and north respectively - Limited bus service is operating as a "bridge" between these two stations... Check ...

Grand Central Madison / East Side Access Radio Frequencies

 by MNCRR9000 ¦  Thu Oct 19, 2023 2:09 am ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: Grand Central Madison / East Side Access Radio Frequencies  ¦  Replies: 0 ¦  Views: 347

I’m updating my notes and was wondering if anybody happened to have the AAR frequencies that match up with these channels for East Side Access / Grand Central Madison. Radio Channel 1 - GCT, TOC, and GCC Radio Channel 2 - Movement Bureau Radio Channel 3 - Midday Yardmaster / Block Operator Radio Cha...

MNRR OCC Districts

 by MNCRR9000 ¦  Thu Oct 19, 2023 12:18 am ¦  Forum: MTA Metro-North Railroad and CtRail Passenger Rail (SLE, Hartford, Extensions) ¦  Topic: MNRR OCC Districts ¦  Replies: 0 ¦  Views: 364

A while back I had a list of MNRR OCC districts and was wondering if anybody happened to have an updated list of the OCC districts and the territory they cover.

Thanks


Sent from my iPhone using Tapatalk

Re: CSX Connecticut

 by MNCRR9000 ¦  Wed Sep 27, 2023 3:02 am ¦  Forum: CSX Transportation including Pan Am ¦  Topic: CSX Connecticut ¦  Replies: 12 ¦  Views: 5003

How often do Marval Industries and Rings End get deliveries?

Re: Valley Tower remoted to JCC

 by MNCRR9000 ¦  Wed Sep 27, 2023 2:56 am ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: Valley Tower remoted to JCC ¦  Replies: 10 ¦  Views: 1016

Lead would be the last remaining "tower" with a block operator. Places where we have operators outside of JCC like West Side Yard, Mid Day Yard, Brook, Grand Central, etc.. are all located in crew facilities. As an example, the operator and yardmaster for Brook are no longer in Brook Towe...

STAMFORD — State officials want to know if people who use the Stamford train station are good with a central plaza and covered bike parking. Or if they have objections to making Station Place a one-way street going west. Since last year, the Connecticut Department of Transportation has been working...

Re: Brightline Dispatching Coca to Orlando

 by MNCRR9000 ¦  Sun May 14, 2023 8:33 am ¦  Forum: Brightline Trains LLC (formerly All Aboard Florida and Virgin) ¦  Topic: Brightline Dispatching Coca to Orlando ¦  Replies: 5 ¦  Views: 755

Jeff Smith wrote: Sun Apr 30, 2023 5:01 am What is the track usage situation south of Cocoa? Does the FEC and Brightline share tracks?

From my understanding south of Cocoa they share tracks with the FEC.

Re: Mass Coastal Railroad (MC) Discussion

 by MNCRR9000 ¦  Sun May 14, 2023 8:30 am ¦  Forum: New England Railfan ¦  Topic: Mass Coastal Railroad (MC) Discussion ¦  Replies: 696 ¦  Views: 194218

Looking at google maps noticed that there are tracks that lead into the Canal Generating Station in Sandwich and was curious how often they receive tank cars. Originally thought everything came in by barge.

Brightline Dispatching Coca to Orlando

 by MNCRR9000 ¦  Sat Apr 29, 2023 6:00 pm ¦  Forum: Brightline Trains LLC (formerly All Aboard Florida and Virgin) ¦  Topic: Brightline Dispatching Coca to Orlando ¦  Replies: 5 ¦  Views: 755

I was curious who dispatches the Brightline segment from Cocoa to Orlando. I believe the Miami to Cocoa segment is Florida East Coast was wondering if it is the same.

Re: The East Side Access Project Discussion (ESA)

 by MNCRR9000 ¦  Thu Jan 26, 2023 12:44 am ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: The East Side Access Project Discussion (ESA) ¦  Replies: 1157 ¦  Views: 376345

Does anybody happen to know the new radio frequencies and channels that are used from Harold Interlocking to GCM?


Sent from my iPhone using Tapatalk

Re: The East Side Access Project Discussion (ESA)

 by MNCRR9000 ¦  Mon Nov 28, 2022 9:18 pm ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: The East Side Access Project Discussion (ESA) ¦  Replies: 1157 ¦  Views: 376345

Also saw a story from Newsday saying that the entire project won’t be done till FEB 2023 but that trains may start rolling into the new terminal by the end of this year… Hopefully After promising for nearly five years that the project would be finished by the end of 2022, a new report notes that con...

Re: The East Side Access Project Discussion (ESA)

 by MNCRR9000 ¦  Mon Nov 28, 2022 7:32 pm ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: The East Side Access Project Discussion (ESA) ¦  Replies: 1157 ¦  Views: 376345

Looks like the FRA granted a waiver to to the LIRR under the assumptions that certain conditions are met. The Federal Railroad Administration posted its decision this week allowing the MTA to open its long-stalled Grand Central Madison — formerly known as East Side Access — project by the end of the...

Re: The East Side Access Project Discussion (ESA)

 by MNCRR9000 ¦  Fri Nov 25, 2022 8:56 pm ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: The East Side Access Project Discussion (ESA) ¦  Replies: 1157 ¦  Views: 376345

Interesting info. Where would have the LIRR have tied into the MNRR lower level? Long story short, a consultant sold The MTA something and no one from LIRR operations was in the room that possessed the knowledge to dispute the consultants claims until it was too late. This project wasn’t done in-hou...

Re: The East Side Access Project Discussion (ESA)

 by MNCRR9000 ¦  Fri Nov 18, 2022 12:50 pm ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: The East Side Access Project Discussion (ESA) ¦  Replies: 1157 ¦  Views: 376345

A last minute hurdle could delay the MTA’s long-stalled $11.6 billion East Side Access project to bring Long Island Rail Road trains into a new station beneath Grand Central Terminal. Transit officials have insisted since 2014 that the new station — dubbed “Grand Central Madison” by Gov. Kathy Hoch...

  • 1
  • 2
  • 3
  • 4
  • 5
  • 59