by MNRR07
M8's behind BJ'S in North Haven Oct. 23, 2010 @ 1600
You do not have the required permissions to view the files attached to this post.
Railroad Forums
Moderators: GirlOnTheTrain, nomis, FL9AC, Jeff Smith
DutchRailnut wrote:well It sure looks like they do match the Circus traingood point!
DutchRailnut wrote:well It sure looks like they do match the Circus trainAnd to think a set of M-8's has about the same HP as the entire Circus train!
UpperHarlemLine4ever wrote:On Monday evening about 9:00PM saw 4 M8's (2 married pairs) pass North White Plains heading towards Southeast.Wow! Really? I could've caught the at my home in WP. Why are they on the Harlem line?
DutchRailnut wrote:good place for high speed (60mph) gap testing because of some 60 mph crossovers and * load of crossings with gaps longer than two cars.Do you know how long they will be using the Harlem Line
also good place for slip/slide testing, if staying ahead of waterworld.
Do you know how long they will be using the Harlem LineThey are testing the M8's all over the railroad...no real set schedule per say...
DutchRailnut wrote:again comparing SEPTA's heavy trolleys with real trains ???i'm still pretty new and why do you call them heavy trolleys?
scheduled is 8 cars in service by December if nothing gets in way.