• Rail service to Calverton?

  • Discussion related to NYAR operations on Long Island. Official web site can be found here: www.anacostia.com/nyar/nyar.html. Also includes discussion related to NYNJ Rail, the carfloat operation successor to New York Cross Harbor that connects with NYAR.
Discussion related to NYAR operations on Long Island. Official web site can be found here: www.anacostia.com/nyar/nyar.html. Also includes discussion related to NYNJ Rail, the carfloat operation successor to New York Cross Harbor that connects with NYAR.
  by Teutobergerwald
 
Any new photos or information?
  by Matty Vee
 
I have some from last weekend. I'm just being lazy. Anyone have a better way to upload pictures instead of attaching them?
  by Teutobergerwald
 
I heard some chatter about NYA basing one of the SW-1001's out at Calverton when the project is completed. What is planned that, if this chatter is true, would warrant an on-site locomotive, rather than the power of the road freights servicing the Main Line? Will there be a yard, or just a lot of busy spurs? Thanks.
  by rb
 
One alternative would be uploading batches of photos to Flickr (free) using their Uploadr program. Then you can link to them.
  by Tommy5
 
Nice to see some progress on the spur :-)
  by Teutobergerwald
 
Is there, or will there be, a siding with the spur branching off of that, like at Pine-Aire, or will it be directly off the Main Line?
  by Shavano
 
Is there, or will there be, a siding with the spur branching off of that, like at Pine-Aire, or will it be directly off the Main Line?
Directly off the main unless another 2 switches are brought in.

Was out there with another a few weeks back...generally the same stuff as the previous shots posted but here's a few new ones..
The switch itself...as said before this is to be the one that joins the spur with the mainline trackage.
Image

Rail detail, 136# rolled this year.
Image

ROW facing west into the facilty
Image

On the opposite side of the former River Rd grade crossing..a few yards south, facing south.
Image
  by Teutobergerwald
 
Excellent work! Keep 'em coming!
  by SemperFidelis
 
Do we have any idea yet as to what rail shipper/receiver will be utilizing this spur?
  by Ðauntless
 
Metro Bio fuel.
  by Teutobergerwald
 
What's the latest out there? Anybody have new photos of the work? Thanks.
  by Hauspiper
 
They were laying track today when I drove by looks like they got the lead to the switch in place. I know the switch may be put in on Sat.
Mike Arnold
US Merchant Marine
www.twinforknrhs.org
www.rmli.us
  by Teutobergerwald
 
Merchant Marine....your credentials are impeccable, sir. Thanks for the update, and keep them coming.
  by workextra
 
The Main Track switch has been Installed but not able to be used at this time.
This is the longest stretch of abandoned train track on Long Island to be restored for the movement of trains.
  by JMBethpage
 
The track switch from the Greenport line to the spur looks to be fully installed but is currently locked into position with a yellow device on the track and a wooden block. The entire turn to bring the spur parallel to Connecticut Ave. is complete with ties and track. The gravel goes part way around the curve. The grading work along Connecticut Ave. and into the old Grumman property looks to be complete. No sign of a crossing at River Rd. yet, but piles of ties stacked nearby. The work is being done by Railroad Construction Co., Inc. of Patterson, NJ.
  • 1
  • 3
  • 4
  • 5
  • 6
  • 7
  • 16