by Lackawanna484
Anybody have an idea of what it would take to get the M&E FL-9 units ready (again) for third rail service? I know they lack shoes now, but that shouldn't be too big a problem with the number of MetroNorth units that have been scrapped, and the original shoes from these units.
With the New Haven lines of CDOT in dire straits (no spare engines, and their MU in obsolescence), maybe M&E could rent these old FL-9s out for another fling on their original turf? Pulling coach sets, or providing protect power...
With the New Haven lines of CDOT in dire straits (no spare engines, and their MU in obsolescence), maybe M&E could rent these old FL-9s out for another fling on their original turf? Pulling coach sets, or providing protect power...