by RCpullerdude
Thanks for all the advise. Like I said, I'm not out to accuratly model the WNYP. But if I put Turner's Mill on one side of a viewblock, and Lord Corporation on the other, it'll instantly say WNYP between Seagertown and Cambridge Springs, PA. The wall will not be an issue. Only four feet of the layout would be against a wall. The other three sides would be easy to access.
I did have a 4x16 foot plan that was quite accurate. It had Cambridge Springs on one side. On the other side, half of it was the first French Creek crossing North of town, and the other half was a staging yard. I just need to find a 4x16 foot area. What if I built 1/2 of the layout, then when I get room for the other half, build that? Would that be a possible solution?
I did have a 4x16 foot plan that was quite accurate. It had Cambridge Springs on one side. On the other side, half of it was the first French Creek crossing North of town, and the other half was a staging yard. I just need to find a 4x16 foot area. What if I built 1/2 of the layout, then when I get room for the other half, build that? Would that be a possible solution?
WNYP, all day, every day!