  by Rail Liner
 
M&E Has Done even more work on the Wippany line. The line is more straight and track more shiney then ever before. I saw a caboose train wich seemed to be going faster then normal.

  by denvillerailfan
 
Work is now continuing North, past Eisenhower Prkwy.
RRCC had behind QuikCheck torn up recently.

Had the roadbed ripped up wide enough fo rtwo tracks... Runnaround??? Dunno.

Wanted to get out to see more, but it has been too busy lately. :-(

  by blockline4180
 
denvillerailfan wrote:Work is now continuing North, past Eisenhower Prkwy.
RRCC had behind QuikCheck torn up recently.

Had the roadbed ripped up wide enough fo rtwo tracks... Runnaround??? Dunno.

Wanted to get out to see more, but it has been too busy lately. :-(
Jeff,

If you can keep us updated we would greatly appreciate it! I'm assuming they will refurbish the tracks all the way down to B&G.

  by Rail Liner
 
I though I would like to mention that I have ties to M&E as I am helping out on occasion with wippany service. It can be hard watching them during the week though with 8 grade and all that go's with that.

  by B_A_R
 
Don't know why the M&E replaced that track to B&G. The rail was only 93 years old!

Also, was the work to upgrade the Livingston trestle paid for with Homeland Security money? I figured that because the trestle is needed to reach the power substation (a 'vital asset').

  by joe k
 
WILL ANY CHANGES BE MADE TO THE BRIDGE OVER EAGLE ROCK AVE.
WITH THIS UPGRADE?

  by Rail Liner
 
I belive they already did work on one of the small bridges

  by joe k
 
I KNOW THE STATE & COUNTY HAVE BEEN SAND BLASTING OLD PAINT FROM BRIDGES ON HIGHWAYS & RR TO REMOVE NOT ONLY RUST BUT THE OLD LEAD BASED PAINT.
WAS THIS BRIDGE SAND BLASTED AND REPAINTED OVER THE LAST FEW YEARS?

  by Rail Liner
 
Alot of the the bridges including the paassic have been replaced within the last year and the non replaced ones have been sanded. I'll find out Sunday though.
  by scavenger33
 
I rode an N5c caboose on Sunday and I would say the track is in good shape since I was able to stand and keep my eye on the kids in the cupola with little effort. I know what bad track feels(and sounds!) like.

Warren

  by joe k
 
WHAT IS THE LATEST INFO ON THE REHAB EAST OF EISENHOWER PKY?
THIS TRACK WAS IN SAD CONDITION......AND IS THERE STILL ISSUES WITH THE SIGNAL OPERATION AT EISENHOWER??

  by Rail Liner
 
The peace of track froom E PARKWAY to the end at 80 is in bad shape to say the least. M&E says thay only go down that stechtch on a very rare to seldom basis.There is more rehab going on between Wippany and Morristown at this time.

  by RS115
 
I don't know the status of the rehab though I agree that it was sorely needed. Not sure why they stopped where they did ($ being the obvious reason) since the only reason to go east of East Hanover is to service the former Polaner (B&G Food?) plant. Given that they are probably the #1 customer on the Whippany line and get drilled 1-2 times/week.