by gravelyfan
gravelyfan wrote:To update the earlier post, there now appears to be lots of catenary wire strung. Within the last week much of the "inbound" route down Broad STreet seems to have been done. The "outbound" segment on Atlantic Street was done a few weeks ago. I also now see some color light signals installed at the interlockings at Broad Street (signals labeled BS) and Lombardy Street (signals labeled FT). I don't know what FT stands for.bonaire wrote:Well, it's finally 2006, so we should be abvle to ride this new extension soon, right? I see progress on tracks being laid, but what about the overhead power lines?Many (if not all) of the catenary structures seem to be up. There is some sort of wire work evident at the two diamond crossover locations (one between Broad Street and University Avenue and the other on the "Penn Station" side of Lombardy Street). As of last week I hadn't seen any wire strung elsewhere.