• F40PH-3C overhaul program

  • Discussion relating to commuter rail, light rail, and subway operations of the MBTA.
Discussion relating to commuter rail, light rail, and subway operations of the MBTA.

Moderators: sery2831, CRail

  by MBTA F40PH-2C 1050
 
1033 sent to BET on the Readville Switcher on Sunday the 10th. The #3 motor needs to be changed out and is having air issues, along with computer issues - ACSES. The joke of the rebuilds continues
  by alasgw
 
What did it specify?
  by alasgw
 
MBTA 1029 has been completed at Erie and may may have shipped already
  by Commuterrail1050
 
I heard that 1029 already shipped. Unknown on its whereabouts.
  by GP40MC1118
 
1024AM by the Fairport NY Railcam today. Last known to be in Syracuse.
  by MBTAVideoClips
 
what route do they take through mass? same as the rotems?
  by Commuterrail1050
 
Yes, same freight and through both secondaries to middleboro then Rochester for testing.
  by jwhite07
 
1029 is on M436 Selkirk-Framingham today (3/23/24) per the B&M Live railcams; passed Chester 11:51AM and Westfield 12:21PM.
  by MBTAVideoClips
 
Will 1029 stay in framingham overnight or go all the way to middleboro overnight
  by GP40MC1118
 
It should go out tonight, but that all depends when M436 landed in Framingham. It would have to be switched out and added
to the local's consist.
  by MBTA F40PH-2C 1050
 
1029 should have made it to Middleboro Wednesday morning 3/27
  by CSRR573
 
Saw the 1033 on the Readville switcher tonight
  by MBTAVideoClips
 
What was the full consist?
  by CSRR573
 
MBTAVideoClips wrote: Tue Apr 02, 2024 8:34 am What was the full consist?
I think it was the 1125, a couple single levels then the 1033
  by MBTA F40PH-2C 1050
 
The 1033 has been calling Readville home. Keeps failing its PTC/ACSES tests
  • 1
  • 65
  • 66
  • 67
  • 68
  • 69