• CSX Track Upgrades & Infrastructure of Pan Am

  • Guilford Rail System changed its name to Pan Am Railways in 2006. Discussion relating to the current operations of the Boston & Maine, the Maine Central, and the Springfield Terminal railroads (as well as the Delaware & Hudson while it was under Guilford control until 1988). Official site can be found here: PANAMRAILWAYS.COM.
Guilford Rail System changed its name to Pan Am Railways in 2006. Discussion relating to the current operations of the Boston & Maine, the Maine Central, and the Springfield Terminal railroads (as well as the Delaware & Hudson while it was under Guilford control until 1988). Official site can be found here: PANAMRAILWAYS.COM.

Moderator: MEC407

  by jamoldover
 
There haven't been active shops of any kind at Billerica in years. In addition, the land and buildings were (I believe) sold to the state when all the rest of the MA property in the commuter zone was. What's left of the tracks is used to serve a few customers, so it's not going to be pulled up, but I wouldn't expect a major investment in the area other than what the MBTA chooses to spend.
  by bostontrainguy
 
Well someone has been improving Billerica. Note the new orange membrane, tracks and switches that have been recently installed.
billerica.jpg
You do not have the required permissions to view the files attached to this post.
  by newpylong
 
I have never seen ballast dropped so fast in my life. Then again, I have never really seen Herzog cars dropping either.
  by CN9634
 
Not sure if it was covered but the 'official date' for the reopening of the Mattwamkeag Line and interchange is November 1st.
  by BlueFlag
 
With some restrictions here and there, track speed Waterville to Keag increased to 25 at midnight.
  by jamoldover
 
BlueFlag wrote: Tue Oct 10, 2023 3:40 pm With some restrictions here and there, track speed Waterville to Keag increased to 25 at midnight.
Does that include the areas within yard limits/other than main track as well?
  by newpylong
 
No. Other Than Main track is Restricted Speed for the entire movement and Yard Limits are explicitly 10 MPH per TT on the New England Division and even if it was raised to 25 per Rule 93 the head end still has to pass through at Restricted Speed.
  by MEC407
 
neman2 wrote: Tue Oct 10, 2023 5:23 pm Video of GREX rail SPS unit (Self Powered Slot) picking up old rail in Clinton. Traveling excavator on top of gondolas.
Neat! The power unit has a single EMD Blomberg truck — and probably a pair of EMD traction motors.
  by F74265A
 
newpylong wrote: Tue Oct 10, 2023 7:09 pm No. Other Than Main track is Restricted Speed for the entire movement and Yard Limits are explicitly 10 MPH per TT on the New England Division and even if it was raised to 25 per Rule 93 the head end still has to pass through at Restricted Speed.
My maps show 112.5 track miles from waterville to keag. Significant portions, but not all, are now reported to be 25. Is it realistic for a single crew to make a WA to keag turn in 12 hours? Seems like a close call since they would do switching in keag.
  by jamoldover
 
Don't forget that the sections through Northern Maine Jct and Bangor are identified as Yard Limits, which will slow things down a bit as well. Depending on the amount of traffic, it might make more sense to run things as an "up one day, back the next" operation, at least for now, and perform switching along the way.