  by pdtrains
 
JohnFromJersey wrote: Thu May 18, 2023 9:23 pm Very strange way of doing things here.
If u expect RR lines to be built or rebuilt in a linear fashion, then I guess you;d think its strange. No reason to do it linearly, tho. Construction done as money, materials, crews, and coordination with local authorities is available.
  by Matt Johnson
 
Caught this picking up the empties by the T Thomas Fortune House in Red Bank this afternoon. Crossing gates were inoperative and the crossing was flagged.
You do not have the required permissions to view the files attached to this post.
  by R&DB
 
Bracdude181 wrote: Thu May 25, 2023 6:34 pm Must be a big train if they had 2 engines…


Sent from my iPhone using Tapatalk
IIRC NJT used to always require Conrail to run two in case of failure on the Coast Line. This was especially true when there were repairs going on to one track or the other. One bad Conrail loco could stop a lot of commuters.
Last edited by R&DB on Fri May 26, 2023 10:55 am, edited 1 time in total.
  by AceMacSD
 
Now they just require paperwork and working PTC. But in reality there never was any requirement for two engines. No BO or SI requiring such.
  by Bracdude181
 
And towards the end they were bringing two engines for 12 plus cars usually, and they still do now.

Has anyone seen RB-1 yet?
  by Bracdude181
 
Checked out the line. No progress besides marking the roads for crossing work and the signs CharlieL mentioned.

Will get pictures again when we see more progress.