• Joint IC Track in E. Dubuque

  • Discussion related to BNSF operations. Official site: BNSF.COM
Discussion related to BNSF operations. Official site: BNSF.COM

Moderator: Komachi

  by Engineer Spike
 
I used to work through E. Dubuque, But I found an old Trains article about the BN from 1988. When did BN get control of this line? I was told that is was single direction track. The interlocking was controled by East Cabin. When was the CTC installed?

  by bones
 
Between Galena Jct. and East Cabin was CTC'd about 1994.