Discussion relating to the past and present operations of the NYC Subway, PATH, and Staten Island Railway (SIRT).

Moderator: GirlOnTheTrain

  by UpperHarlemLine4ever
 
There was third track that was put in for testing new equipment on the Dyre Avenue line. Is it still in place?
  by Kamen Rider
 
Pretty sure they're still using it.
  by Allan
 
Track Y3 is still in place and is presently used mainly for equipment moves between Dyre and E 180.

Just F Y I track Y4 has been extended to the entire length of the Pelham Parkway station (it used to end mid platform).
  by UpperHarlemLine4ever
 
Thank you all for the responses.