Anyone catch the planned hi-rail inspection on Saturday? Made several stops along the Chester, HB, and D&R branches from 10-Noon, unable to detect any activity.
Aside from the the "Begin M&E Rlwy" sign removed at Lake Jct (MP41.4), ownership appeared unchanged with all of M&E's relics stored around the property including an SW, Geep, couple of ex-Amtrak baggage cars, and a string of badly vandalized ex-NJT comets. The M&E however, has removed advertisement of service over these branches on their website (though the 'about M&E' section continues to elude to servicing them.)
With the NJT trainsets laying over in Dover yard, was unable to find the recent SWs shipped there either.
Is the first train still expected to run on Wednesday 7/5 down the D&R?
Aside from the the "Begin M&E Rlwy" sign removed at Lake Jct (MP41.4), ownership appeared unchanged with all of M&E's relics stored around the property including an SW, Geep, couple of ex-Amtrak baggage cars, and a string of badly vandalized ex-NJT comets. The M&E however, has removed advertisement of service over these branches on their website (though the 'about M&E' section continues to elude to servicing them.)
With the NJT trainsets laying over in Dover yard, was unable to find the recent SWs shipped there either.
Is the first train still expected to run on Wednesday 7/5 down the D&R?