Hatboro station has had some construction work going on for a few weeks. I finally had time to walk by and see what it is.
They are building an additional length of platform between the station house and Byberry road. It won't stretch all the way to byberry road, but, I'd put it at 100 to 150 feet of platform being added. it is low level. I don't know if they'll add a high level stand for ADA requirements.
I was surprised to not see this work described anywhere. usually SEPTA describes work being done in some of their planning documents.
I don't know if they could bring in a 6 car set and not keep both Byberry road and moreland road gates up while boarding.
Currently, the train can't pull further into the block the train is on, as the 'platform' is from moreland to the station house, which is about at the halfway point of the block. When a 6 car set does come to the station, the 6th car usually occupies byperry road, for southbound direction, or, for north bound trains, the 6th car doors are over gravel/unimproved surface and left unopened.
Now if only they'd put one of those digital train status boards in Hatboro and willow grove, THAT would be nice.
They are building an additional length of platform between the station house and Byberry road. It won't stretch all the way to byberry road, but, I'd put it at 100 to 150 feet of platform being added. it is low level. I don't know if they'll add a high level stand for ADA requirements.
I was surprised to not see this work described anywhere. usually SEPTA describes work being done in some of their planning documents.
I don't know if they could bring in a 6 car set and not keep both Byberry road and moreland road gates up while boarding.
Currently, the train can't pull further into the block the train is on, as the 'platform' is from moreland to the station house, which is about at the halfway point of the block. When a 6 car set does come to the station, the 6th car usually occupies byperry road, for southbound direction, or, for north bound trains, the 6th car doors are over gravel/unimproved surface and left unopened.
Now if only they'd put one of those digital train status boards in Hatboro and willow grove, THAT would be nice.