• Snow-clearing duty

  • Discussion related to NYAR operations on Long Island. Official web site can be found here: www.anacostia.com/nyar/nyar.html. Also includes discussion related to NYNJ Rail, the carfloat operation successor to New York Cross Harbor that connects with NYAR.
Discussion related to NYAR operations on Long Island. Official web site can be found here: www.anacostia.com/nyar/nyar.html. Also includes discussion related to NYNJ Rail, the carfloat operation successor to New York Cross Harbor that connects with NYAR.
  by Teutobergerwald
 
Did the LIRR press the NYA's fleet into service clearing the lines of snow during/after the storm on Thursday?
  by Teutobergerwald
 
NYA have to help out the LIRR today?
  by LINYARailfan
 
The LIRR Darth Vader snow plow is OOS at this time due to a car slamming into it out in KO yard. I'm not sure if the LIRR will be using the Geeps from NYA for plowing the snow east of KO. A foot of snow is not a lot of snow so the DEs can probably handle it maybe a 1500 if you are lucky.
  by Teutobergerwald
 
Did the LIRR commandeer the NYA's GP38-2's to clear the tracks?
  by Crabman1130
 
LINYARailfan wrote:The LIRR Darth Vader snow plow is OOS at this time due to a car slamming into it out in KO yard. I'm not sure if the LIRR will be using the Geeps from NYA for plowing the snow east of KO. A foot of snow is not a lot of snow so the DEs can probably handle it maybe a 1500 if you are lucky.
The MTA posted a picture on Facebook of Darth working in Mattituck.