by csor2010
They had the middle of the bridge opened up when I walked over the BU bridge the other night, so assuming they're working in order from Cambridge to Boston they're approaching halfway done.
Railroad Forums
Moderators: sery2831, CRail
jaymac wrote:Given Norm Vigeant's photo of 12-16 ( http://photos.nerail.org/s/?p=205501 ), this may or may not be the appropriate thread to state that at 0950 on 12-17-2012, D-3 gave SRS125 to the Burncoat YL to wait for a foreman and the later to Harvard. No on-air discussion if it was for a Sperry ferry or actual work.It was indeed a "Sperry ferry". The B&A from Worcester to Cove was tested over the weekend, and it was moving back to the North Side.
AEM7AC920 wrote:Equipment move to the northside in south sta at the moment with quite the consist! Look out for itI heard him get a Form D from the D3 dispatcher to head up the Worcester Main (Burncoat to Harvard) around 10 this morning. I believe the lead unit was 1032?
bmcdr wrote:Us Navy guys call that "Flying the Colors."BostonUrbEx wrote:bmcdr wrote:I'm 59 years old, I have no idea what a smiley face means.
AWWWW..... isn't that cute, my generation has something similar involving a finger.