by The EGE
Not sure why this hasn't gotten a topic yet. The T is apparently planning to add a side platform to track 2 at Ruggles, thus allowing all CR trains to stop there without crossover moves. Looks like a standard 800' x 12' high-level platform with a pedestrian tunnel under the busway. No mention of repairing the island platform, but hopefully that will occur as well.
There is an open house TODAY at Northeastern from 4:30 to 6:30pm. It's a stop-by-anytime deal.
Open House flyer
Powerpoint with design drawings
There is an open house TODAY at Northeastern from 4:30 to 6:30pm. It's a stop-by-anytime deal.
Thursday, October 18, 2012MBTA project page
4:30 PM – 6:30 PM
Cabral Center
John D. O’Bryant African American Institute
Northeastern University
40 Leon Street, Boston
Open House flyer
Powerpoint with design drawings