[Germany]North-South Mainline near Rastatt blocked...

Discussion about railroad topics everywhere outside of North America.

Moderators: Komachi, David Benton

[Germany]North-South Mainline near Rastatt blocked...

Postby Motorman » Sat Aug 12, 2017 4:42 pm

A mishap during tunneling works has blocked the Mainline south of Rastatt for an (until now) undefined duration.
Chaos is here. :(
Here are some pics: https://www.drehscheibe-online.de/foren ... sg-8269239
And here it is: https://www.google.de/maps/@48.8449773, ... a=!3m1!1e3
As some of the potential detours are closed for routine maintenance, it will be a nightmare to get trains running in schedule again.
Latest news say, it may take at least one week to solve the problem...
Motorman
 
Posts: 13
Joined: Sat Apr 23, 2016 8:18 am

Re: [Germany]North-South Mainline near Rastatt blocked...

Postby amtrakhogger » Sat Aug 12, 2017 5:56 pm

It looks like a sinkhole or a culvert collapsed.
"I will stop at St. Avold."
User avatar
amtrakhogger
 
Posts: 1812
Joined: Sun Jun 25, 2006 12:16 am
Location: "F" on the Camden and Amboy

Re: [Germany]North-South Mainline near Rastatt blocked...

Postby kato » Sun Aug 13, 2017 2:34 am

They were boring a tunnel underneath. Due to heavy water flux there was a landslide inside the tunnel construction site, which collapsed the surface above.

The whole section where the tunnel crosses the existing line was under permanent surveillance using a laser grid for exactly that kind of thing, hence preventing any accidents.
kato
 
Posts: 150
Joined: Sat Mar 22, 2008 9:06 am

Re: [Germany]North-South Mainline near Rastatt blocked...

Postby Motorman » Tue Aug 15, 2017 9:08 am

Update:
Officials say, that the "tunnel" will be filled with concrete and the tunnel boring machine will be abandoned.
There were more slides in the last hours, so waiting for an "idea" is not an option.
When the conrete-plug is finished, the railroadbed will be renewed, temporary.
This sounds weird, but this is much cheaper than an undefined lockup.
The traffic is already in chaos, as there are no suitable detours possible.
Motorman
 
Posts: 13
Joined: Sat Apr 23, 2016 8:18 am

Re: [Germany]North-South Mainline near Rastatt blocked...

Postby CarterB » Tue Aug 15, 2017 9:38 am

Hoppla!! Wir haben einen großen Fehler gemacht!
Deutsches Ingenieurwesen ist nicht das, was es früher war !!
Bring back the Slumbercoaches!!
User avatar
CarterB
 
Posts: 2539
Joined: Fri Mar 12, 2004 9:19 am
Location: Bergen County, New Jersey

Re: [Germany]North-South Mainline near Rastatt blocked...

Postby Motorman » Tue Aug 15, 2017 12:32 pm

CarterB wrote:Hoppla!! Wir haben einen großen Fehler gemacht!
Deutsches Ingenieurwesen ist nicht das, was es früher war !!


Hehe, when we Germans make mistakes, they're perfect in any way. :-D :wink:
Motorman
 
Posts: 13
Joined: Sat Apr 23, 2016 8:18 am

Re: [Germany]North-South Mainline near Rastatt blocked...

Postby kato » Thu Aug 17, 2017 11:10 am

There were some rumours that they were using an experimental stabilization method for the construction, to be exact pumping cooling agents through pipes in the tunnel walls leading to the surrounding ground being iced solid.

Any truth to that?