Postby EuroStar » Tue Sep 19, 2017 3:51 pm

The DEIS for the Southeast HSR is out https://www.fra.dot.gov/Page/P0729. Mostly adds third track. The cost of the bypasses seems excessive, so I doubt that they will happen.
EuroStar
 
Posts: 506
Joined: Fri Oct 19, 2012 8:26 pm
Location: Middle of Nowhere

Re: SEHSR Southeast High Speed Rail Corridor

Postby lpetrich » Fri Sep 22, 2017 7:57 pm

That's DC - Richmond only, but it will still be good. I checked the Executive Summary, and it showed where the additional tracks would be. I also found that it made no mention of electrification.
lpetrich
 
Posts: 1178
Joined: Sun Sep 21, 2008 2:09 pm

Re: SEHSR Southeast High Speed Rail Corridor

Postby bdawe » Fri Sep 22, 2017 8:05 pm

Given commuter traffic, existing and potential intercity traffic, DC-Richmond electrification seems like it should be worth more exploration. Wouldn't fewer trains being re-powered in DC be a plus for terminal capacity there too?
B. Dawe's map of routes and urban populations https://brendandawe.carto.com/viz/80b9d ... /embed_map NOW updated with 2016 Canadian Populations
User avatar
bdawe
 
Posts: 577
Joined: Thu Apr 16, 2015 1:06 pm
Location: Vancouver, British Columbia

Re: SEHSR Southeast High Speed Rail Corridor

Postby electricron » Fri Sep 22, 2017 10:57 pm

Would be a great idea if the rail corridor being used was owned by Amtrak or the Commonwealth of Virginia. But it is not! It is owned by a freight railroad company with no intentions at all hanging electric wires above its tracks. Someone on another thread suggested 24 trains a day or so is needed to make it worthwhile, and I don’t think there’s that many trains stop in Richmond. Trains that go further, like to Raleigh, Newport News, and Norfolk will have to switch locomotives in Richmond anyways, so all this will accomplish is move the location where it will occcur on most trains. The delay experenced by passengers will still be experenced by most of them. And in that same thread it was suggested the price for electrification was $10+ Million/mile of track. There’s 123 rail miles of track between Richmond and D.C. so the costs of this improvement will be at least $1.23 Billion.

If you are going to spend that much only electrifying the rail corridor, let’s improve the speed of the trains so they can go faster than those using diesel locomotives. And that means maximum speeds of the trains over 125 mph for the entire corridor. Otherwise, the money is being wasted with no appreciable gain in the trains’ performance.
electricron
 
Posts: 4192
Joined: Tue Aug 25, 2009 8:35 pm

Re: SEHSR Southeast High Speed Rail Corridor

Postby mtuandrew » Fri Sep 22, 2017 11:27 pm

There is a lot of realignment potential in that distance too; it's only 109 highway miles from Washington Union Station to Richmond Main Street Station. Best not to throw money at electrification which doesn't reasonably need to be spent until 125+ mph comes into the picture, when the existing ROW isn't really good for more than 90/110 in places.
User avatar
mtuandrew
 
Posts: 4699
Joined: Tue Feb 20, 2007 2:59 am
Location: the Manassas Gap Independent Line

Re: SEHSR Southeast High Speed Rail Corridor

Postby deathtopumpkins » Mon Sep 25, 2017 11:15 am

bdawe wrote:Wouldn't fewer trains being re-powered in DC be a plus for terminal capacity there too?


Potentially, but at the expense of losing economies of scale. Several trains would still need to change engines in DC, meaning Amtrak would still need to keep a yard crew there, and the required infrastructure, in addition to adding this infrastructure in Richmond. Unless they're extending full Northeast Corridor service (i.e. Acela and Regionals) south to Richmond, it makes far more sense to keep the engine swap at a major terminal like Washington where Amtrak already has the facilities for it.
Call me Connor or DTP

Railfan & Roadgeek from the North Shore of Mass.
deathtopumpkins
 
Posts: 1035
Joined: Tue Aug 27, 2013 8:56 am
Location: Somerville, MA

Re: SEHSR Southeast High Speed Rail Corridor

Postby dowlingm » Fri Sep 29, 2017 10:31 am

Amtrak carries out Regional/Vermonter swaps in New Haven. How much yard/crewing is required for that operation?
dowlingm
 
Posts: 1070
Joined: Mon Apr 16, 2012 12:42 pm
Location: Toronto, ON

Re: SEHSR Southeast High Speed Rail Corridor

Postby deathtopumpkins » Fri Sep 29, 2017 12:52 pm

It's a moot point because you already have the economy of scale. New Haven is already a large maintenance base with leftover facilities from the hundred years when it was the end of electric territory. It already has an established yard and crews. Plus it's Amtrak's base of operations for SLE, which it runs under contract.

Richmond has none of those things. It's apples to oranges.
Call me Connor or DTP

Railfan & Roadgeek from the North Shore of Mass.
deathtopumpkins
 
Posts: 1035
Joined: Tue Aug 27, 2013 8:56 am
Location: Somerville, MA

Re: SEHSR Southeast High Speed Rail Corridor

Postby dowlingm » Fri Sep 29, 2017 3:25 pm

I forgot about SLE. That's a good point. However, didn't Amtrak cut back Pennsylvanian loco change to PHL rather than HBG for pretty similar reasons? I wonder what the # of loco changes would be before it because viable.
dowlingm
 
Posts: 1070
Joined: Mon Apr 16, 2012 12:42 pm
Location: Toronto, ON

Re: SEHSR Southeast High Speed Rail Corridor

Postby electricron » Fri Sep 29, 2017 4:57 pm

How many Amtrak trains continue on the Springfield line that need locomotive swaps at New Haven?
Southbound (15 minutes scheduled stop)
55 Vermonter (Mon-Fri)
57 Vermonter (Sat-Sun)
141(Mon-Fri)
143 (Sat-Sun)
147 (Sat)
157 (Sun)
Northbound (15 minutes scheduled stop)
54 Vermonter (Sat-Sun)
56 Vermonter (Mon-Fri)
136 (Fri)
140 (Sat-Sun)
146 (Sat)
148 (Mon-Fri)
Basically, that’s 4 Amtrak trains on weekdays and 6 Amtrak trains on weekends. I
electricron
 
Posts: 4192
Joined: Tue Aug 25, 2009 8:35 pm

Re: SEHSR Southeast High Speed Rail Corridor

Postby Sylvain727 » Fri Feb 23, 2018 3:40 pm

Where are they with the Southeast High Speed Corridor ?
Raily Yours

Sylvain727
Sylvain727
 
Posts: 81
Joined: Sun Mar 30, 2008 11:59 pm
Location: Trois-Rivières,QC Canada A town between Montreal and Quebec City

Re: SEHSR Southeast High Speed Rail Corridor

Postby mtuandrew » Fri Feb 23, 2018 4:06 pm

Sylvain727 wrote:Where are they with the Southeast High Speed Corridor ?

Not much more visible progress. I expect to see more development in 2019 after United States legislative and North Carolina state elections.
User avatar
mtuandrew
 
Posts: 4699
Joined: Tue Feb 20, 2007 2:59 am
Location: the Manassas Gap Independent Line

Re: SEHSR Southeast High Speed Rail Corridor

Postby Sylvain727 » Wed Mar 07, 2018 2:56 am

Ok. I'm aware the works for the new brand new Raleigh Amtrak station will finish this year so I'm sure
that the new Amtrak HSR trains will be stop in brand new station from Washington, DC and Richmond and Petersburg, VA via
the future Petersburg-Raleigh corridor which was a former S-Line from Seaboard Coast Line Railroad later CSX which one has
removed the ties and the rails from Petersburg, VA to Norlina in the middle 80s.
Raily Yours

Sylvain727
Sylvain727
 
Posts: 81
Joined: Sun Mar 30, 2008 11:59 pm
Location: Trois-Rivières,QC Canada A town between Montreal and Quebec City

Re: SEHSR Southeast High Speed Rail Corridor

Postby Arlington » Wed Mar 07, 2018 9:29 am

The new Raleigh Station will be many years old before any train reaches via a rebuilt S-Line.

Virginia's only active project is road: HOT lanes extended to Fredericksburg, which was part of a larger road-and-rail funding and planning effort: http://www.atlanticgateway.net/ In the short term SEHSR progress is going to be limited to additional 3rd and 4th tracks to increase capacity between DC and Fredericksburg.
"Trying to solve congestion by making roadways wider is like trying to solve obesity by buying bigger pants."--Charles Marohn
Arlington
 
Posts: 3508
Joined: Wed Jun 02, 2004 7:51 am
Location: Medford MA (was Arlington MA and Arlington VA)

Re: SEHSR Southeast High Speed Rail Corridor

Postby gokeefe » Wed Mar 07, 2018 12:31 pm

The EIS process is very active from what I've seen. Adding tracks and addressing the Long Bridge bottle neck are no small undertakings.

In effect SEHSR is being built right before our very eyes, just not with any fanfare or publicity. It's being done in a slow incremental fashion that allows for a major expansion later once all the pieces are in place to the north.

Even if construction were underway on the S-Line right now south of Richmond it would be almost pointless given the constraints getting into DC.
gokeefe
User avatar
gokeefe
 
Posts: 10396
Joined: Sat Feb 16, 2008 12:28 pm
Location: Winthrop, Maine

Previous

Return to General Discussion - Passenger Rail

Who is online

Users browsing this forum: No registered users and 3 guests